Sail Barsua Iron Mines

Installation of 33 KV Substation for enhancement of contract demand from 4 MVA to 5 MVA at Barsua Iron Mines

  • Client: Sail Barsua Iron Mines
  • Industry: Metals and Minerals

Project Scope

Technisys Engineering was entrusted with the design, construction, and commissioning of a 33 KV switchyard. The project included the installation of high-voltage equipment, control systems, and integration with the electrical grid network.

Technisys Engineering was entrusted with the design, construction, and commissioning of a 33 KV switchyard. The project included the installation of high-voltage equipment, control systems, and integration with the electrical grid network.

Supply, Laying, and Commissioning of 33 KV ACSR buswork and 11 KV cables. 

Construction of a new building and a concrete cable trench from the control room to the switchyard.

Construction of a new building and a concrete cable trench from the control room to the switchyard.

Dismantling of the existing 11 KV overhead line for the township from Substation No. 2 to the 11 KV pole near the time office, replacing it with a new 11 KV cable.

Rerouting of the existing 11 KV cable from the present reactor location to the relocated reactor.

Managing logistics and scheduling due to the complex integration of electrical systems across multiple stages of the plant.

Maintaining strict adherence to safety and environmental guidelines.s.

Coordinating with ongoing operations at Bhilai Steel Plant to minimize downtime.

Challenges Overcome

The successful completion of the project has resulted in improved electrical reliability and enhanced capacity for the Bhilai Steel Plant.

The successful completion of the project has resulted in improved electrical reliability and enhanced capacity for the Bhilai Steel Plant.

Outcome