Power Grid Corporation of India Limited (PGCIL) – Madurai Substation

Design, Supply, Erection, Testing & Commissioning of New LT AC System & Dismantling of Existing LT System at Madurai Substation

  • Client: Power Grid Corporation of India Limited (PGCIL)- Madurai
  • Industry: Electricity transmission
  • Location: Madurai Substation

Items Supplied

Indoor Components of LT System
  • 415V AC Main Switch Board (MSB)
  • 415V AC Switchyard Distribution Board (ACDB)
  • 415V ACDB Extension Panels (Outdoor Closed Type) for Colony Main Supply
  • 415V AC Main Lighting Distribution Board (including two lighting transformers)
  • 415V AC Emergency Lighting Distribution Board (including one 100KVA lighting transformer)
  • 415V AC Emergency Diesel Switchgear
  • 415V ACDB for Colony Lighting (Outdoor Type)
  • 415V Air Conditioning Distribution Board (DB)
  • 48V DC Distribution Board (DCDB)
  • 220V DC Distribution Board (DCDB)
  • Mandatory Spares as per BOM

Outdoor Components of LT System

  • 630KVA, 11kV/0.433KV DYn1 Transformer
  • 12kV, 400A, Horn Gap Fuse (1 Phase) with Support Insulator
  • 12kV, 3Phase, 630A, 25KA, Manual Operated HDB (without Earth Switch, Beam Mounted)
  • 11kV Post Insulators (1 Phase)
  • 9kV, Class-III Surge Arrestor (1 Phase)
  • 11KV/110V Potential Transformer (1Ph)
  • 11KV Erection Hardware (as per attached BOM)
  • 1Cx630sqmm Al.XLPE Cable (including Clamps, Glands, Lugs & Straight Joints)
  • 3.5Cx300 Sqmm XLPE Cable (including Clamps, Glands, Lugs & Straight Joints)
  • 10CX2.5Sq.mm Control Cable (including Clamps, Lugs & Glands)

Challenges and Solutions

Coordination and Integration
Logistical Complexity
Technical Execution
Safety and Compliance
Environmental Considerations

Project Significance

This project is a significant step towards modernizing and enhancing the power transmission infrastructure in Madurai. It demonstrates our commitment to delivering high-quality, reliable, and efficient solutions that meet the evolving needs of the power grid