Mishra Dhatu Nigam limited-Rohtak

Supply, Erection, and Commissioning of Power Supply and Electrical Distribution System for Rohtak Plant

  • Client : Mishra Dhatu Nigam limited-Rohtak
  • Industry : Metallurgical

Project Background

Mishra Dhatu Nigam Limited (MIDHANI), a Government of India Enterprise, invited tenders for the supply, erection, commissioning, and testing of a power supply and electrical distribution system for their Rohtak Plant. The project aimed to enhance the plant’s electrical infrastructure to meet the growing demands of operations.

Scope of Work

The project encompassed a comprehensive scope of work, including:

Supply and Erection
  • Power Supply and Electrical Distribution System: Supply and installation of a 33KV power supply and electrical distribution system.
  • Cables and Accessories: Supply and installation of 120 Sqmm, 33KV cables, end termination kits, and cable trays.
  • HT and LT Breakers: Supply and installation of HT breakers and distribution transformers.
  • Bus Ducts: Supply and installation of 433 Volt bus ducts.
  • Control Panels: Supply and installation of power/AC distribution panels, DC distribution panels, and other control panels.
Commissioning and Testing
  • Performance Guarantee Tests: Conducting performance guarantee tests to ensure the system meets specified parameters.
  • Provisional Acceptance Certificate (PAC): Issuance of PAC after successful completion of tests.
  • Final Acceptance Certificate (FAC): Issuance of FAC after successful completion of the defect liability period.
Documentation and Training
  • Technical Documentation: Submission of detailed technical documentation, including drawings, manuals, and test reports.
  • Training: Training of MIDHANI personnel on the operation and maintenance of the installed systems.

Challenges Faced

During the execution of the project, several challenges were encountered:

Technical Challenges
Logistical Challenges
Compliance Challenges

Overcoming Challenges

To address these challenges, the following strategies were employed:

Technical Solutions
Logistical Solutions
Compliance Solutions

Project Completion and Certification

The project was successfully completed within the stipulated timeframe, and the following milestones were achieved:

Provisional Acceptance Certificate (PAC)
Final Acceptance Certificate (FAC)
Conclusion

The successful completion of the power supply and electrical distribution system project at MIDHANI’s Rohtak Plant is a testament to our commitment to excellence. Overcoming significant technical, logistical, and compliance challenges, we delivered a robust and reliable electrical infrastructure that meets the highest standards of performance and safety. This project underscores our capability to undertake and execute complex projects, ensuring client satisfaction and long-term reliability.