Supply, Erection, and Commissioning of Power Supply and Electrical Distribution System for Rohtak Plant
- Client : Mishra Dhatu Nigam limited-Rohtak
- Industry : Metallurgical
Project Background
Mishra Dhatu Nigam Limited (MIDHANI), a Government of India Enterprise, invited tenders for the supply, erection, commissioning, and testing of a power supply and electrical distribution system for their Rohtak Plant. The project aimed to enhance the plant’s electrical infrastructure to meet the growing demands of operations.
Scope of Work
The project encompassed a comprehensive scope of work, including:
- Power Supply and Electrical Distribution System: Supply and installation of a 33KV power supply and electrical distribution system.
- Cables and Accessories: Supply and installation of 120 Sqmm, 33KV cables, end termination kits, and cable trays.
- HT and LT Breakers: Supply and installation of HT breakers and distribution transformers.
- Bus Ducts: Supply and installation of 433 Volt bus ducts.
- Control Panels: Supply and installation of power/AC distribution panels, DC distribution panels, and other control panels.
- Performance Guarantee Tests: Conducting performance guarantee tests to ensure the system meets specified parameters.
- Provisional Acceptance Certificate (PAC): Issuance of PAC after successful completion of tests.
- Final Acceptance Certificate (FAC): Issuance of FAC after successful completion of the defect liability period.
- Technical Documentation: Submission of detailed technical documentation, including drawings, manuals, and test reports.
- Training: Training of MIDHANI personnel on the operation and maintenance of the installed systems.
Our Projects
- SAIL Bhilai Plant
- SAIL Barsua Iron Mines
- IRCON International Ltd- Sector 43 Mall (Noida)
- IRCON International Ltd- Sector 48 Mall (Noida).
- Gail India Ltd- Kailaras
- Indian Oil Corporation Ltd- Assam
- SAIL Gua Ore Mines
- Deendayal Port Authority- Kandla
- Balmer Lawrie Co Ltd- Kolkata
- SJVN Ltd- Jhakri.
- NTPC Ltd- Koldam
- Nabinagar Power Generating Company
- Power Grid Corporation India Ltd-Shivpuri
- Rites Limited-Kalaburagi
- Power Grid Corporation India Ltd-Madurai
- Steel Authority of India Limited (SAIL) – Rourkela Steel Plant, Barsua Iron Mine.
- NLMK INDIA Coating Pvt Ltd.
- Power Grid Corporation of India Limited (PGCIL)-Poducherry
- GAIL (India) Limited-Faridabad
- Indian Oil Corporation Limited (IOCL)-Vijaywada
- Mishra Dhatu Nigam Limited (MIDHANI)-Hyderabad
- Steel Authority of India Limited (SAIL), Rourkela Steel Plant, Barsua Iron Mines
- Mishra Dhatu Nigam limited-Rohtak
Challenges Faced
During the execution of the project, several challenges were encountered:

Technical Challenges
- Complexity of Electrical Systems: The complexity of the electrical systems required meticulous planning and execution.
- Coordination with Existing Infrastructure: Ensuring seamless integration with existing electrical infrastructure at the Rohtak Plant.

Logistical Challenges
- Material Supply: Ensuring timely supply of high-quality materials and components.
- On-Site Coordination: Coordinating with multiple stakeholders and ensuring smooth on-site operations.

Compliance Challenges
- Regulatory Compliance: Adhering to stringent regulatory standards and obtaining necessary approvals.
- Environmental Considerations: Implementing environmentally friendly practices during installation and commissioning.
Overcoming Challenges
To address these challenges, the following strategies were employed:

Technical Solutions
- Expertise and Experience: Leveraging the expertise of experienced engineers and technicians.
- Advanced Planning: Implementing advanced project planning and simulation tools to anticipate and mitigate potential issues.

Logistical Solutions
- Robust Supply Chain: Establishing a robust supply chain to ensure timely delivery of materials.
- On-Site Management: Deploying dedicated on-site project managers to oversee operations and ensure smooth execution.

Compliance Solutions
- Regulatory Expertise: Engaging with regulatory bodies to ensure compliance with all applicable standards.
- Environmental Best Practices: Implementing best practices for environmental management and sustainability.
Project Completion and Certification
The project was successfully completed within the stipulated timeframe, and the following milestones were achieved:
- Date of Issuance: Date of Issuance: [Insert Date]
- Scope: The PAC was issued after successful completion of performance guarantee tests, confirming the system's readiness for commercial operation.
- Date of Issuance: [Insert Date]
- Scope: The FAC was issued after the successful completion of the defect liability period, marking the formal acceptance of the project by MIDHANI.
The successful completion of the power supply and electrical distribution system project at MIDHANI’s Rohtak Plant is a testament to our commitment to excellence. Overcoming significant technical, logistical, and compliance challenges, we delivered a robust and reliable electrical infrastructure that meets the highest standards of performance and safety. This project underscores our capability to undertake and execute complex projects, ensuring client satisfaction and long-term reliability.