- Home
- IRCON International Ltd- Sector 48 Mall (Noida)
Electrification of Gate Main Lodges at Level Crossings & Colour Light Signal Panels at Station Building, Mathura Kashganj-Kalyanpur Section, North Eastern Railway
- Client: IRCON International Ltd- Sector 48 Mall (Noida)
- Industry: Railway infrastructure and engineering
Key Deliverables
- Gate Main Lodge Electrification Comprehensive electrification at designated level crossings to ensure operational efficiency and safety.
- Wiring and Earthing Installation of robust wiring and earthing systems in compliance with stringent safety standards.
- Colour Light Signal Panels SITC of advanced signal panels at station buildings, including associated wiring and control systems
- Signal Equipment Earthing Deployment of specialized earthing solutions to ensure safety and regulatory compliance.
Challenges and Solutions
Challenge: Synchronizing Work Across Multiple Locations
With numerous level crossings and station buildings across the section, coordinating the workflow across scattered sites posed a significant logistical challenge.
Solution Implemented a phased execution strategy and leveraged centralized communication tools to ensure seamless coordination across locations
Challenge: Adhering to Railway Standards
Meeting the precise and rigorous standards set by the railway authorities for wiring, earthing, and signaling systems required meticulous attention to detail.
Solution: Our team collaborated closely with railway engineers, conducted frequent inspections, and deployed specialized equipment to meet compliance requirements.
Challenge: Weather and Terrain Constraints
Adverse weather conditions and challenging terrain occasionally disrupted progress, especially during outdoor wiring and earthing work.
Solution Deployed weather-resistant equipment, reinforced safety measures, and restructured schedules to optimize productivity in unfavorable conditions.
Challenge: Ensuring System Reliability
Ensuring uninterrupted functionality of electrification and signaling systems was critical for railway operations.
Solution Conducted multiple rounds of testing and validation to ensure all systems were fail-safe and aligned with operational requirements.

Project Success
Despite these challenges, the project was successfully completed on time with a focus on quality and safety. Our efforts were recognized through the Completion Certificate awarded by IRCON International Ltd., reaffirming our commitment to excellence.
Our Projects
- SAIL Bhilai Plant
- SAIL Barsua Iron Mines
- IRCON International Ltd- Sector 43 Mall (Noida)
- IRCON International Ltd- Sector 48 Mall (Noida).
- Gail India Ltd- Kailaras
- Indian Oil Corporation Ltd- Assam
- SAIL Gua Ore Mines
- Deendayal Port Authority- Kandla
- Balmer Lawrie Co Ltd- Kolkata
- SJVN Ltd- Jhakri.
- NTPC Ltd- Koldam
- Nabinagar Power Generating Company
- Power Grid Corporation India Ltd-Shivpuri
- Rites Limited-Kalaburagi
- Power Grid Corporation India Ltd-Madurai
- Steel Authority of India Limited (SAIL) – Rourkela Steel Plant, Barsua Iron Mine.
- NLMK INDIA Coating Pvt Ltd.
- Power Grid Corporation of India Limited (PGCIL)-Poducherry
- GAIL (India) Limited-Faridabad
- Indian Oil Corporation Limited (IOCL)-Vijaywada
- Mishra Dhatu Nigam Limited (MIDHANI)-Hyderabad
- Steel Authority of India Limited (SAIL), Rourkela Steel Plant, Barsua Iron Mines
- Mishra Dhatu Nigam limited-Rohtak