Power Grid Corporation of India Limited (PGCIL)-Poducherry

Procurement of Balance Supply for Construction of 230/110kV Thondamanatham Substation and R&M of 110/22kV Villianur Substation

  • Client : Power Grid Corporation of India Limited (PGCIL)-Poducherry
  • Industry : Industry electricity transmission

Detailed Scope of Work

110 KV Equipment:
  • 110 KV, 1600 Amps HDB Isolator (3-ph without earth switch)
  • 110 kV Solid core Post Insulator
  • 110 KV, 200 A, Current Transformer (1PH with 120% extended current rating)
  • 96 KV Lightning Arrestor (1PH – class-3, Gapless)
22 kV Equipment
  • 22 kV 1250 A, VCB (3 phase, spring operated) along with support structure
  • 22 kV, 400 A, DB Isolator (3 phase) without earth switch
  • 18 KV Surge arrester (1 ph) class-2
  • 22 kV Bus post insulator
Control & Relay Panels
  • 110/22kV Transformer Protection panel (HV & LV side) with automation
  • Control panel for 2 nos of 22kV lines
  • Protection panel for 2 nos of 22kV lines
  • Control panel for 2 nos of 22kV capacitor bank
  • Protection panel for 2 nos of 22kV capacitor bank
Structures
  • Lattice Structure (Non-standard structures as per site requirement)
  • Foundation bolts including nuts, checknuts, and washers for lattice structures
  • Miscellaneous structural steel (excluding reinforcement steel and steel for lattice and pipe structures)
Clamps & Connectors
  • Various tension and suspension string assemblies with disc insulators and clamps suitable for ZEBRA ACSR
Power Connectors
  • 110kV and 22kV side connectors (Tee connectors, terminal connectors, flexible connectors, etc.)

Earthing Material

  • MS Rods, GS Flats, rod electrodes, and other earthing materials
Power Cables
  • 3.5Cx70 sq.mm and 4Cx16 sq.mm cables
Illumination
  • Street lighting poles, LED street lights, and outdoor receptacles

Challenges and Solutions

Complex Site Conditions
Coordination and Scheduling
Technical Compliance
Safety and Compliance

Project Significance

This project is a significant step towards modernizing and enhancing the power transmission infrastructure in Puducherry. It demonstrates our commitment to delivering high-quality, reliable, and efficient solutions that meet the evolving needs of the power grid.

Successful Completion

We are proud to announce that this project has been successfully completed, meeting all the specified requirements and timelines. Our team’s dedication and expertise ensured seamless execution and delivery, contributing to the robust power infrastructure of the region.